
B–62444E–1/04
8. EDITING MACHINING PROGRAMS
OPERATION
107
The ratio of the machining time of each process to that of the entire
machining program is indicated in a bar chart at the bottom of the screen.
NOTE
The machining time described above is displayed after
simulation or actual machining is completed. If the
simulation or actual machining is stopped in the middle by
a reset, the machining time may not be displayed.
Machining times longer than 99 minutes are not displayed.
During simulation, machining time data is summed by
calculating the execution times for individual move
commands. However, such a machining time can differ from
the actual machining time, depending on the prevailing
conditions, including the feedrate override and
miscellaneous function operation times. During actual
machining, the actual machining time data is displayed.
The sequence of processes registered in a machining program can be
changed in units of processes.
On the process editing screen, move the cursor to the process to be moved,
then press the [TRANS.] soft key. The following operation guidance is
displayed.
CANCEL EXEC
SPECIFY DESTINATION ³ SOFT KEY [EXEC]
Move the cursor to the process which is to be followed by the moved
process and press the [EXEC] soft key. The selected process is inserted
immediately after the process specified by the cursor.
If the [CANCEL] soft key is pressed on the operation guidance shown
above, the move operation is canceled and the system returns to the
original state.
NOTE
The initial setting process cannot be moved. An attempt to
move it will be ignored.
8.6.2
Moving a Process for a
Tool Post