Cut Off the Power Line to Motor at Alpha (HV)i Series SVM Additional Manual Page 1

Additional Manual
TECHNICAL REPORT(MANUAL) NO.TMS 03009E
Date 2003/02/28
General Manager of
Servo Laboratory
Function of interception of the power line to motor at Alpha(HV)i series SVM
1. Communicate this report to:
Your information only
GE Fanuc-N, GE Fanuc-E
FANUC Robotics
MILACRON
Machine tool builder
Sales agency
End user
2. Summary for Sales Documents
3. Notice
4. Attached Document
Drawing
NO.
A-72562E-0025
EAO
Original section of issue
Department
Manager
Section
Manager
Person in
Charge
FANUC

Contents Summary of Cut Off the Power Line to Motor at Alpha (HV)i Series SVM Additional Manual

  • Page 1TECHNICAL REPORT(MANUAL) NO.TMS 03/009E Date 2003/02/28 General Manager of Servo Laboratory Function of interception of the power line to motor at Alpha(HV)i series SVM 1. Communicate this report to: Your information only GE Fanuc-N, GE Fanuc-E FANUC Robotics MILACRON Machine tool builder Sales agen
  • Page 2Function of interception of the power line to motor at Alpha(HV)i series SVM 1. Overview So far the external MCC has been necessary to cut the power to motor of the each axis. The power to the motor can be cut by this function instead of connecting external MCC. 2. Applied SVM (1) SVM1-10HVi: A06B-6
  • Page 34. Requirement (1) Please monitor the state of the circuit by the contact “B”. In case the state of the circuit is not monitored, there is a possibility that the motor is energized unexpectedly. (2) This function does not satisfy the requirement for safety standard by itself. MTB should compose the
  • Page 47. Notice (1) The dummy connector to shorted CN7-A1 and CN7-A2 is inserted at shipment. When you do not use this function, the dummy connector must be inserted. In case you put off the dummy connector, the motor can not be operated. (2) Please take care not to short 24V. Cut off the power line to mo