SYW The next block operation of G51.8 command that is starting spindle synchronous
control.
0 : It Is performed as soon as PSYFN signal was set to 1.
1 : It is performed after the synchronize is completer with spindle synchronous control
and the phase matching is competed with spindle phase synchronous control.
4810 Error pulse between two spindles when synchronizing phases in the serial spindle
synchronization control mode
[Data type] Byte
[Unit of data] Pulse
[Valid data range] 0 to 255
Set the difference in error pulse between two spindles when synchronizing phases in the
serial spindle synchronization control mode. When the difference in error pulse between
two spindles is within the value set in this parameter , the spindle phase
synchronization completion signal FSPPH becomes 1.
This parameter is used to check the difference in phase in synchronization control and to
confirm the completion of synchronization in the serial spindle synchronization control
mode.
4811 Allowable error count for the error pulses between two spindles in the serial
spindle synchronization control mode
[Data type] Word
[Unit of data] Pules
[Valid data range] 0 to 32767
Set the allowable error count for the error pulses between two spindles in the serial
spindle synchronization control mode.
This parameter is used for the output phase error monitoring signal SYCAL that is
detected phase error between the two spindles in the serial spindle synchronization
control mode. When phase error between the two spindles was greater than the value set
in this parameter, SYCAL signal is set to 1.
Edit
16
17
A-78807E
Drawing No.
Page
Date
Design
Descri
tion
Date
2004/07/02
Design
K.Yamamuro
Approv.
FANUC Series 16i/18i/21i-TB
Spindle synchronous control
Title