
1998/ 5/26
3 AUTOMATIC PHASE SYNCHRONIZATION
FOR FLEXIBLE SYNCHRONOUS CONTROL
3.1 General
In the flexible synchronous control, when synchronization start or
cancellation is specified, synchronization is not started or canceled
immediately.
Instead, acceleration/deceleration is executed first. Therefore,
synchronization can be started or canceled while the master axis is
rotating. Also, automatic phase synchronization can be performed
such that the machine zero position of the master axis matches the
slave axis position at the synchronization start.
This function needs “Automatic phase synchronization for flexible
synchronous control” option.
Edit
10/30
Data Si
nature
Descri
tion
Flexible synchronous control Specifications
A-63540EN
Drawing No.
Page
2004/08/10 H.Minami
Whole revision E.Genma
04
05
2004/08/19
ddition of (5)
FANUC Series 16i/18i - MB/TB, 18i - MB5
Title