B–62073E–1/04 2. INTERFACE BETWEEN CNC AND PMC–NA OR NB
– 219 –
(e) Spindle phase synchronization completion signal: MSPPHS
[Classification]
Output signal
[Function] Informs that spindle phase synchronization (phase difference control) is completed in the se-
rial interface spindle.
[Output Condition]
The signal goes high when:
⋅ The system is in the spindle synchronization mode, the two spindles achieve the spindle
speed corresponding to the signal specifying the spindle speed to be detected in syn-
chronization, and SPPHS causes the spindles to be in the same phase (the difference
between the error pulses of the two spindles is less than or equal to the value specified
in parameter 5810).
The signal goes low when:
⋅ The system is in the spindle synchronization mode, but the two spindles are not in the
same phase.
⋅ The system is in the spindle synchronization mode, and the difference between the error
pulses of the two spindles is larger than the value specified in parameter 5810.
⋅ The system is not in the spindle phase synchronization mode.
NOTE The signal is switched from high to low if the value specified in parameter 5810 is exceeded
due to a change in cutting load or other reasons.
(f) Spindle synchronization alarm signal: SPSYAL
[Classification]
Output signal
[Function] Informs that the difference between the error pulses of the two spindles of the serial interface
spindle is larger than the value specified in the parameter in the spindle synchronization
mode. This signal is used for handling the spindle synchronization error. After the signal goes
high, the signal level is maintained. The signal goes low after the spindle synchronization
mode is released.
[Output Condition]
The signal goes high when:
⋅ The system is in the spindle synchronization mode, and the difference between the error
pulses of the two spindles after spindle synchronization is completed exceeds the value
specified in the parameter.
The signal goes low when:
⋅ The system is not in the spindle synchronization mode.
⋅ The system is in the spindle synchronization mode, and the difference between the error
pulses of the two spindles is less than or equal to the value specified in parameter 5811.
(g) Velocity integrating control signals: INTGA, INTGB
[Classification]
Input signals
[Function] Validate or invalidate the velocity integrating control function for the serial interface spindle.
[Operation] When the signal is high, the velocity integrating control function is invalidated. (This has the
same effect as when the velocity loop integrating gain is zero.) When the signal is low, the
velocity integrating control function is validated. When the two spindles which are mechani-
cally connected to each other by holding an identical workpiece in the spindle synchroniza-
tion mode are slightly out of synchronization, the velocity integrating control function gener-
ates the torque required to synchronize the spindles. This may increase the load meter
output. INTGA or INTGB invalidates the velocity integrating control function, causing the
speed to be controlled only by the proportional speed control function.
The two spindles are mechanically connected to each other when:
(1) The two spindles hold an identical cylindrical workpiece after spindle speed synchroniza-
tion is completed.
(2) The two spindles hold an identical workpiece with an irregular shape after spindle phase
synchronization is completed.
To synchronize the two spindles without generating an unnecessarily large torque for each
spindle, the velocity integrating control signal must be specified for the two spindle amplifiers