
B–62073E–1/04 2. INTERFACE BETWEEN CNC AND PMC–NA OR NB
– 225 –
(d) Specify the difference of error pulses in parameter 3174 of the second spindle as the shift in spindle
phase synchronization.
Generally, the shift of the first spindle must be set to zero.
(e) After canceling the spindle synchronization command, re–execute spindle phase synchronization un-
der the following conditions. Check that the spindles are synchronized in the same phase as desired.
1 SFR is set on (SRV is set off) for both the first and second spindles: M03
2 The command specifying the spindle speed to be detected in synchronization is set to 0 rpm: S0
2.3.36 Signals for switching the spindle output of serial interface spindle
(1) DI/DO signals
(a) Switching request signals: RSLA, RSLB
[Classification]
Input signals
[Function] Switch the output characteristics.
[Operation] When the signal is low, high–speed output (high) is executed.
When the signal is high, low–speed output (low) is executed.
(b) Power line status check signals: RCHA, RCHB
[Classification]
Input signals
[Function] Check the selection status of the magnetic contactor that switches the output characteristics
of the spindle motor.
[Operation] When the signal is low, high–speed output (high) is executed. When the signal is high, low–
speed output (low) is executed.
(c) Power line switching signals: RCHPA, RCHPB
[Classification]
Output signals
[Function] The request signal for switching the output characteristics, RSLA or RSLB, turns off the power
supply to the motor. When the power supply is turned off, the status of RCHPA or RCHPB
is changed. The magnetic contactor for switching the power line must then be switched with
this signal as shown in (iii), (iv), and (v) of (2), “Sequence.”
[Operation] When the signal is low, high–speed output (high) is executed. When the signal is high, low–
speed output (low) is executed.
(d) Switching completion signals: RCFNA, RCFNB
[Classification]
Output signals
[Function] The request signal for switching the output characteristics, RSLA or RSLB, and the power line
status check signal, RCHA or RCHB, are entered in that order. After checking that the desired
status is selected, the initial setting of the spindle control circuit is completed and the system
becomes ready for the next operation. On that occasion, RCFNA or RCFNB is output.
[Operation] When the signal is low, high–speed output (high) is executed. When the signal is high, low–
speed output (low) is executed.