The system requests a last confirmation before proceeding w
can be observed on the server-side as follows:
ith Image file creation is initiated. This
Figure 58: GhostCast Server: Image Creation
Dependent on Network speed and transmitted data amount, a typical Image creation takes approx.
10-20 minutes. Typically about 4-6GB are required on a Panel i / Panel i for Automotive, when
Developing, Maintenance and Operating Software is installed. In the test following software has
been installed:
• Operating System Windows 2000/XP
• CIMPLICTY Machine Edition/FANUC Ladder IIIC
• CIMPLICITY Plant Edition and HMI-SOP Project
• Basic Operation Package (HSSB)
• Screen Display Function (HSSB)
• Screen Display Function (Ethernet)
Figure 59: Ghost Image Size of a typical Panel i (/for Automotive) Installation
File Name: Backup_Guidance_EN21.doc
Created by: Olaf Sklepik on 20-Apr-05
Approved by: n/a
Page 65 of 72