B–63172EN/01
2. PREPARATORY FUNCTIONS
NC FUNCTION
21
Table 2 G code list (2/2)
G code FunctionGroup
G73 Peck drilling cycle
G74 Counter tapping cycle
G76 Fine boring
G80
Canned cycle cancel
G81 Drilling cycle, spot boring
G82 Drilling cycle, counter boring
G83 09 Peck drilling cycle
G84 Tapping cycle
G85 Boring cycle
G86 Boring cycle
G87 Back boring cycle
G88 Boring cycle
G89 Boring cycle
G90
Absolute command
G91
Increment command
G92 00 Setting for work coordinate system/Clamp of maximum spindle speed
G94
Feed per minute
G95
Feed per rotation
G96
Constant surface speed control
G97
Constant surface speed control cancel
NOTE
1 The G codes of group 09, group 10, group 13 and G92
clamp of maximum spindle speed are only for the Power
Mate i–D.
2 G02, G03, G12.1, and G13.1 are desabled for the Power
Mate i–D (2–path control).