
10.HOLE CYCLE CYCLE MACHINING B-64254EN/02
- 168 -
3. Peck drilling
Tool motion if parameter No.5101#2=1.
• Peck drilling
At No. 5101#2=1
Z axis clearance
Depth of hole
Escape amount
(No.5114)
Base position
Depth of cut
(Pecking)
1
2
3
4
5
6
7
8
9
(1) The tool moves from the initial position, to the edge of clearance
Z, moving in rapid traverse along the Z axis.
(2) The tool moves, in rapid traverse along the X axis, to the position
X=0.
(3) The tool moves in cutting feedrate along the Z by P-CUT (Depth
of Cut) in –Z direction.
(4) The tool moves to the edge of clearance Z, moving in rapid
traverse along the Z axis in +Z direction..
(5) The tool moves in rapid traverse along the Z axis to the previous
position + escape amount.
(6) The tool moves in cutting feedrate along the Z by P-CUT (Depth
of Cut) - the escape amount in –Z direction.
(7) Steps 4 to 6 are repeated until the tool reaches the bottom of the
hole.
(8) The tool moves to the edge of clearance Z, moving in rapid
traverse along the Z axis in +Z direction.
(9) The tool return to the initial position, moving in rapid traverse
first along the X axis and the along the Z axis.