B-70255EN/01 9.SETTING AND ADJUSTMENT
- 119 -
(5) After output of the maximum command value, wait 3 minutes.
Record the DCV, DCI, RFV, and RFI values of each power
supply. Then, check that the value of RFV does not exceed the
maximum RFV (Table 9.1.7).
9.1.4.2 Pulse Output Test
Output the pulse test command specified in the Table 9.1.7 by 5 Hz
and 5% for a pulse test time, and check that no alarm is issued. If a
problem is observed, make another power supply adjustment.
9.1.4.3 Completion of Adjustment
Return the modified parameter values in the Item 9.1.2.1 to the
original values.
9.1.5 RFI and DCV Value Recording and Adjustment
The laser power supply involves feedback at RFI. So, if the laser
power feedback function is disabled, RFI is stable when the
continuous output command is used. Basically, measure RFI for
power supply adjustment. If the NC monitor is away from the
oscillator, and you have no assistant, make an adjustment by using the
value of DCV instead of RFI. However, use the value of RFI for final
confirmation. The connector CN18 for RFV and RFI monitoring was
added to the power supply of B209. When using this connector,
follow the conversion formula described in Note 2 of Table 2.
9.1.6 Alarm Processing after Modification of Intra-tube Pressure at
Oscillation Time and Bias Command Setting
After modification of parameter No. 15242 and No. 15243 (intra-tube
pressure at oscillation time) and parameter No. 15223 (bias
command), take the actions below.
(1) If an alarm indicating a parameter value modification is
displayed, reset the alarm, and set HV ON.
(2) If an alarm requesting that the CNC power be turned off is
displayed, and purge operation is started, turn off the power to
the NC upon completion of purge operation, and restart.