
5. TUTORIAL
B–61863E–1/06
GENERAL
36
NOTE
USER GDT ADDRESS = 845000 for PMC–SC/SC3/SC4.
USER GDT ADDRESS = 245000 for PMC–NB/NB2.
USER GDT ADDRESS = 900200 for PMC C Language
function (Series 16i/18i/21i/15i–A).
Task information definition screen of MKC (Link control
statement creation tool)
Setting for task3 was added
LINK CONTROL DATA(TASK) Ver 1.2 <OVRWRT>
TASK ENTRY NO.3 (TASK ID= 12)
ENTRY ADDRESS NAME = task3
DATA SEGMENT GDT ENTRY = 37 (32 – 95)
STACK SIZE = 1024
TASK LEVEL = 25 (–1:HIGH/10 – 99)
TASK NAME = TASK3
[ MAIN ] [ MEMORY ] [ TASK ] [ QUIT ] [ EXIT ]
Task level of task1 is 30, task2 is 20, task3 is 25.
Task3 (Cyclic task) executes while task2 (Cyclic task) waits for
the time.
Task1 (PCMDI task) executes while task1 (Cyclic task) and task2
(Cyclic task) waits for the time.